Skip to content

Supply and Delivery of 630A Electrical distribution system for Staff Accommodation in Port city

Lorem ipsum dolor sit amet, consectetuer adipiscing elit, sed diam nonummy nibh euismod tincidunt ut laoreet dolore magna aliquam erat volutpat. Ut wisi enim ad minim veniam

AI based Temperature monitoring system at KSPA Packaging

Lorem ipsum dolor sit amet, consectetuer adipiscing elit, sed diam nonummy nibh euismod tincidunt ut laoreet dolore magna aliquam erat volutpat. Ut wisi enim ad minim veniam,

Loom Monitoring System at SASIRI POLYSACKS (PVT) LTD , NAWALOKA HOLDINGS

Lorem ipsum dolor sit amet, consectetuer adipiscing elit, sed diam nonummy nibh euismod tincidunt ut laoreet dolore magna aliquam erat volutpat. Ut wisi enim ad minim veniam,

Battery Backup system at SIEMENS GAMESA (PVT) LTD

Lorem ipsum dolor sit amet, consectetuer adipiscing elit, sed diam nonummy nibh euismod tincidunt ut laoreet dolore magna aliquam erat volutpat. Ut wisi enim ad minim veniam,

Installation of 30KW Centrifugal Pump with all DI pipe accessories, soft starter pump control panel

Installation of 30KW Paragon, USA Split Case Centrifugal Pump with all DI pipe accessories, soft starter pump control panel. Design, Supply, and Installation including all cable laying of the Lamp control panel.

Loom Monitoring system installation (stage 2) at Ceytec Packaging (pvt) ltd.

Ongoing Loom Monitoring system installation (stage 2) at Ceytec Packaging (pvt) ltd.

Recent Posts

  • Living In the Beach
  • Fire For Cold Weather
  • Build a Beautiful Website
  • Hard Work For Success
  • TIPS FOR ARTISTIC PEOPLE

Archives

  • October 2016

Categories

  • building
  • creativity

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org